Boulder | |
|
|
Secondary breaking of large boulder with multiple free-face (Semi-hard rock)
|
Secondary breaking of boulder in underground (hard rock)
|
Ditch excavation | |
![]() The proper angle of drilled hole is 60º or less. After the breaking of the cut part, load and break the part tobe widened. ![]() Drilled Hole Diam. 40 mm. Cex Broke Used 42 Kg/m3. |
|
Bench cutting | |
![]() |
For breaking a prescribed height of rock, itis necessary to drill a hole 5% deeper than the heiight required to be broken. For wide bench first break (a), and 6-12 hours late load (b) Cex Broke. |
![]() Drilled hole Diam. 40 mm. Cex Broke used 5 Kg/m3. |
|