Reinforced concrete | |
Good effects can be obtained by forming cracks in parallel to the main reinforcement. Better effects can be obtained by cutting the restraining reinforcement. (hoop and stirrup). Cex Broke loaded in the space directly inside the reinforcement will easily separate the covering concrete and will expose the reinforcement. |
|
Machine Foundation Drilled Hole Diam. 40 mm.
|
![]() |
Bridge Pier | |
![]() Drilled Hole Diam. 40 mm. Cex Broke Used 11 Kg/m3. |
![]() |
Unreinforced concrete | |
![]() Drilled Hole Diam. 40 mm. Cex Broke Used 11 Kg/m3 |
![]() |
Temporary structures | |
Hole drilling operation can be eliminated by burying 35-50 mm diam. sheath tubes (extra thin steel) in advance and that will provide goods effects on both economy and shortening construction period. |
|
![]() Drilled Hole Diam. 40 mm Cex Broke Used 8 Kg/m3. |
![]() |
EXPANSIVE YES |
EXPLOSIVE NO |